# PF-002 C3 analytical slice, version 1: results

**Virtual lab - simulated experiment. Analytical model only.** Everything below is exact algebra and arithmetic on declared equations, checked twice by independent code. It is not an observation, a new law, an exclusion, a thrust claim, physical validation or an apparatus qualification. No physical apparatus was tested in this slice, and C3 has not been observed.

This document sits outside the 11 pinned run inputs and changes none of them. Numbers are read from the one retained report. Native states are not `tt.result.v1` acceptance states.

## Outcome

**The frozen identities and arithmetic checks hold, and the physical questions stay open.** The output premise is still underdetermined. All 131 checked entries reached their expected state. 115 are verified identities and 16 are guarded quotients that are undefined by design. All 14 required adverse and refusal cases, with 20 subcases, reached their frozen states.

The physics questions stay where the proposal left them:

| Question | Status |
| --- | --- |
| The radiated phase of original C3, `P-theta` | Underdetermined: the original action has no drive, output or reference |
| The reservoir `Y` | Unspecified by the reduced model |
| The autonomous energy ledger | Underdetermined |
| Candidate K2's stability, covariance and closure | Unproved |
| A bound on original C3 | No applicable bound found in the bounded two-source assessment. That is not a universal absence of bounds |

## Record

| Item | Value |
| --- | --- |
| Report | 54832 bytes, sha256 `2ebfe32e7290a6c78aa38c2cf22e2d3b628d0eed5ac6fc870634607be3978da4`, [record](pf002-c3-analytical-v1-report-evidence/report.json) |
| Launch receipt | sha256 `49dd1433adcdf5a5b4a4eb93719268b01044070d2970228e4fc84f4693e767bd`, [receipt](pf002-c3-analytical-v1-report-evidence/receipt.json) |
| Root-reviewed receipt and spent ledger | [receipt](pf002-c3-analytical-v1-report-receipt.json) |
| Run | 2026-11-03T22:40:58Z. 0.242 s within a 300 s budget including cleanup. One worker. Supervisor PID 85188, child 85195. Exit 0, no survivors by signal or `ps` |
| Commit | `a9d3026fe6e6e752b49de17595dfdb29d8a35dd6`. Reviewed code at `4727997cbe8d5e037b0276324bcec8fbde7971a1` |
| Runtime | CPython 3.14.6 |
| Freeze and science digests | `4649adfa77a9f80a75d594a831f82bcaee2656c707ca5ca389cdd72b9481f290`, `ccee76b0447ae8c1994e261462b28eab64f13c23b83d4e3926065044b9d5484d` |

**The report is spent.** It must not be rerun, replayed or retuned.

**What the freeze covers.** The 11 run-time source hashes are historical facts, kept in git and in the receipt, and tied to the run commit `a9d3026`. They are not a permanent ban on edits.

- **Must stay byte-exact:** the 5 report implementation files (the twin, guard, checker, oracle and report builder), the dossier and the source ledger. Publication checks the implementation files for drift.
- **May change later, under separate review:** the existing focused-test file, for test-only lifecycle compatibility. That change would sit outside the report implementation. A new file alone cannot repair its hard-coded fixture-state assertions.

Nothing was edited during publication preparation. The private raw launch file, sha256 `0e4c8c793ed394327109203d6da0aaa556f2fb7af9f1799d1ac831a81286f075`, stays in ignored evidence and is never committed.

## What holds, as algebra and arithmetic only

Each identity was derived by the checker, rederived by an independent oracle with hand-expanded formulas, and compared with the claim in the dossier. The guard classified the three-way comparison.

| ID | What was checked | Retained value | State |
| --- | --- | --- | --- |
| V1 | C3's gyroscopic two-form | `F_Rs = -G*nu`, `F_Rnu = G*s`, `F_snu = 2*G*R`. Nonzero for `G != 0`, so C3 is then not a total derivative. `G = 0` recovers the null | Verified |
| V2 | Euler-Lagrange equation for the mode, with the corrected minus sign | `Cm*thetadot - w - 2*w2*s + G*(nu*Rdot + 2*R*nudot)` | Verified |
| V3 | Adding a total derivative changes no equation | Zero for all four gauge terms and four coordinates | Verified, 16 entries |
| V4 | A phase-coordinate change moves nothing physical once drive and output maps transform with it | Detected phase `-theta` for every frozen `c` | Verified, 15 entries |
| V5 | Signed loop integrals | Rectangle `A_Rnu = -2`, reversed `+2`, collapsed `0`, the same for every `q`. Control square `B_snu = -2`, degenerate line `0` | Verified, 35 entries |
| V6 | Cross-multiplied shared-coefficient identity `J*A_Rnu + Cm*Phi_h*B_snu = 0` | Zero for every frozen `h`, including `h = 0`. The quotient `-Cm` is formed only when nothing is zero | Verified, 20 entries, plus 4 quotients verified and 16 undefined |
| V7 | Constants from retained values | `alpha` 19564.80 per metre per unit `h`, within 9.2e-5 of `k*nhat`. `Cm` 6.834e-25 J s. Rectangle `Phi_h` 0.039130 rad per unit `h`. Radiative budget 8.0168e-12 J per cycle per unit `abs(h)` and 0.000561176 W per unit `abs(h)` | Verified, 6 entries |
| V8 | Botermann arithmetic for the declared variant `C3-U(q)` | `q` central 1.16298e-8, 1-sigma 1.78323e-8. No confidence bound, no credit to original C3 | Verified, 4 entries |
| V9 | Static-stress counterexample and radiative inequality | Poynting vector zero and `T_zz = eps0*E0^2/2` for a static field. Carrier margins non-negative | Verified, 4 entries and 6 margins |

**Required cases.** Each reached its frozen state:

| Case | State reached |
| --- | --- |
| Unknown detector transfer | `readout_unknown_unproved` |
| `kappa_theta = 0`, `Delta != 0`, or phi-dependent loading | `outside_regime_unproved` |
| A7 quotient at `h = 0`, or on a collapsed loop | `quotient_undefined` |
| Downstream reference, or skew that follows path length | `adverse_not_signal` |
| Botermann, K1 or K2 results applied to original C3 | `variant_not_transferable` |
| Malformed input | `refused_input` |
| The deliberate wrong-value fixture | `identity_failed`, as designed |
| The B2 budget applied to static stress, near-field stress, a background force, incoming radiation, K1 or K2 | `outside_regime_unproved` |

## What this does not establish

- No physical C3, reservoir or radiated phase.
- No bound on original C3, and no exclusion.
- No apparatus performance, and no closed-system thrust.
- Verified identities show that the stated algebra is self-consistent across two implementations. They do not show that the equations describe nature.
- Unit checks are boolean assertions, not identity states.
- The static-stress result limits the radiative budget to outgoing radiation only. It says nothing about local field completions in general.

## Spent ledger, including failures

Seven bounded focused-fixture invocations ran, and none was retried in place:

| Invocation | Commit | Tests | Exit | Note |
| --- | --- | --- | --- | --- |
| 1 | `9d301c1` | 32 | 0 | |
| 2 | `035f7fe` | 38 | 0 | |
| 3 | `f7c0f1a` | 51 | **1** | Failed: a validator refusal had the wrong type. Retained |
| 4 | `5c88608` | 51 | 0 | |
| 5 | `26a8c60` | 54 | **1** | Failed: two test defects. Retained |
| 6 | `3be8391` | 54 | 0 | |
| 7 | `63256b1` | 54 | 0 | |

There was one analytical report run, no retry and no dry composition. Fixture evidence stays in ignored review evidence, with receipt hashes in the [root-reviewed receipt](pf002-c3-analytical-v1-report-receipt.json).

**A known housekeeping item.** Three focused-test assertions assume the earlier fixture lifecycle state, so they fail at the report-state twin. A later, separately reviewed test-only change may edit the existing test file to fix them, outside the report implementation. No test fix is made here.

## Beyond the present limits

These are proposals, not results or authority.

1. **Derive an output law.** Model a microscopic emitter, so the radiated phase follows from the dynamics. The phase route fails if no admissible model gives a loop phase.
2. **Find a constant-loading design.** Hold `kappa` and the drive constant over the loop. The mean-offset route fails if no design meets the guard with a known readout.
3. **Bound K2.** Prove a lower bound on its interacting Hamiltonian on a finite domain. K2 fails if the bound does not exist.
4. **Develop `C3-R`'s feed balance.** Predict the feed-side deficit of a radiative carrier. It fails if no deficit appears at a stated sensitivity.
5. **Read more primary tests.** Read further primary sources before any bound is claimed. A bound needs an independent scale and a declared coupling map.